Al Berka Pumping Station

 


Under construction

updated 11.05.17

 

 

 

Inspection Opeartions of Pumping station ..23rd January 2017

Watching the flow meter reading during operation for Al Berka pumps. 23.01.2017

Inspection for the electrical works at Al Berka PS in the presence of PWA, CMWU, Deir Al Balah Municipality, the Consultant and the contractor. Date: 23.01.2017

Meetings to plan pump operations
..December 2017

Meeting with the CMWU engineers to discuss some issues related to operating of Al Berka existing pumps. Date: 12.12.2016
Presence: from left: Eng. Moutaz Abu Alqomboz (CMWU, Eng. Abdelhadi Al Wehadey (Norplan/CEP, Mechanical Engineer, Eng. Abdelnasser Bohasi (Zediah company), Eng. Majd Zakoot (CMWU), Eng. Omar Shata (CMWU), Eng. Ahmed kullab (PWA), Dr. Ashraf Nijim ( Norplan/CEP, Electrial Engineer), Eng. Basim Sirdah (Norplan/CEP, R.E.) and Eng. Tawfic Hamad (PWA)

Meeting with the Agent for ABS pumps to discuss some issues related to operating of Al Berka existing pumps. Date: 10.12.2016
Presence:  from left: Eng. Abdelnasser Bohasi (Zediah company), Eng. Mazen Abu Shahla (ABS agent), Eng. Basim Sirdah (Norplan/CEP, R.E.), Eng. Abdelhadi Al Wehadey (Norplan/CEP, Mechanical Engineer and Dr. Ashraf Nijim ( Norplan/CEP, Electrial Engineer).



Review Eletrical works
..Oct- Nov. 2017

Above
Discussion the electrical works for Al Berka Pump station. Presence from Left: Eng. Abdel Nasser Al Buhasey (Zediah Company), Eng. Mohamed Al Jazzar (Zediah Company), Eng. Hashim Taha (CMWU Electrical Eng.), Dr. Ashraf Nijm (Norplan/CEP Electrical Eng.), Mr. Mahmood Hejazi (Zediah Company), Eng. Abedulhady El Wehady (Norplan/CEP Mechanical Eng.) Eng. Basim Sirdah (Norplan/CEP), Eng. Ashraf Al Najjar (Norplan/CEP). Date 02.11.2016
Eng. Radwan Keriam (Deir Al Balah Municipality

Above right
I nspection for the MDB at Berka Pump station. Rght:Maintenance works at station

   
Berka Pumping station: Jan 2016
Al Berka pumping station finded by Turkish Government and completed in 2011.
The station has been unused but should have ample camapity to handle population now being connected by the new propsed sewerage network.
The pumping station is fitted with generator and the powersupply appear satisfactory. Of cause tests will tell in once wastewater is connected.
 
Project news flash ..date:
 
US support for nearby water reservoir ..date:
USAID is providing support to the construction of a water reservoir nearby and very close the Al Berka wastewater pumping station. It appears appropriate that a sewer network in introduced to handle the wastewaters and to prevent groundwater contamination.

 